WARWICK, RI — Traffic through the Apponaug Four Corners Roundabout (Greenwich Ave./Post Road), narrowed Sept. 5 as the first half of stamped concrete crosswalks were poured, will stay that way another week as the second half is poured Sept. 15.
The RIDOT advises motorists to expect narrowed lanes in the area as stamped concrete as traffic is shifted to one side, allowing the concrete to set and cure on the other side of the crosswalk. The work will create delays, and RIDOT advises drivers to plan alternate routes around the construction.
Additional ongoing traffic advisories in Warwick:
This is a test