VIDEO: Bay Crane Moves 280-Ton Load Through Rhode Island
By: Rob Borkowski on July 11, 2017 in Business, News to You
WARWICK, RI — Bay Crane and RIDOT settled on terms for moving a generator, truck and trailer totaling 280 tons over 54 bridges along an engineer-approved route Monday, then followed […]
Bay Crane, RIDOT Negotiating Fee For Planning Route, Moving Bridge-Straining 280-Ton Load
By: Rob Borkowski on July 8, 2017 in News to You
WARWICK, RI — RIDOT Director Peter Alviti, Jr. said Friday the state intended to invoice Bay Crane for the expense of a 10-day assessment of the roads and bridges along the Rte. 102 […]
UPDATE: Bridge-Straining 161-Ton Generator’s RIDOT – Approved Trip Delayed
By: Rob Borkowski on July 7, 2017 in News to You
UPDATE: John Tassoni, spokesman for Bay Crane, the company hired to transport the 161-ton generator through the state, confirmed tonight the move has been delayed due to a disagreement between […]
Bridge-Straining 161-Ton Generator At Rte. 117 Park & Ride as RIDOT Seeks Safe Route
By: Rob Borkowski on July 1, 2017 in News to You
WARWICK, R.I. — A 161-ton generator hauled by a truck the US Army uses to move tanks halted on Rte. 95 in Warwick Tuesday then moved to the Rte. 117 […]