Warwick, RI – The Barton Corner Bridge Project is ahead of schedule, so replacement of the northbound bridge span over Rte. 2 starts tonight, closing Rte. 2 between Division Street to just south of James P. Murphy Industrial Highway at 9 p.m.
[Watch the Barton Corner Bridge project live online via RIDOT webcams. The page also includes turn-by-turn directions for getting around the construction area.] For safety reasons, the public is discouraged from watching the move from the side of the highway or along Rte. 2.
You will need to get on I-95 North from Division Street and drive up to Exit 10. Follow Route 117 West where you can take a left at the fourth signal for Route 2 North or turn left at the sixth signal for Route 2 South, depending on your final destination.
- Turn right onto Division Street East
- Take the on-ramp to I-95 North
- Take Exit 10; turn left for Route 117 West
- Turn left at 4th signal for Route 2 North
or - Turn left at 7th signal for Quaker Lane, follow to Route 2 South
Rte. 2 South:
You will need to use I-95 South to get around the closed roadway. Take the on-ramp just before the bridge and take the next ramp, Exit 7. Reverse direction using I-95 North and follow to Exit 8A to reach Route 2 South.
- Take on-ramp for I-95 South
- Take Exit 7, turn left
- Turn left for on-ramp to I-95 North
- Take Exit 8A for Route 2 South
Rte. 4 North to Rte. 2 North
You will need to get on I-95 North from Division Street and drive up to Exit 10. Follow Route 117 West where you can take a left at the fourth signal for Route 2 North or turn left at the seventh signal for Route 2 South, depending on your final destination.
- Stay on Route 4, merge onto I-95 North
- Take Exit 10; turn left for Route 117 West
- Turn left at 4th signal for Route 2 North
or - Turn left at 7th signal for Quaker Lane, follow to Route 2 South
For more information on the Barton Corner project, visit www.dot.ri.gov/BartonCorner.
This is a test