Top

RI Trooper Log: Arrests for False Document, Check Fraud RI Trooper Log: Arrests for False Document, Check Fraud
RI Trooper Log: Arrests for False Document, Check Fraud
Warwick Mayoral Matchup: Handicapping the Solomon-Stenhouse Race Warwick Mayoral Matchup: Handicapping the Solomon-Stenhouse Race
Warwick Mayoral Matchup: Handicapping the Solomon-Stenhouse Race
Horace Receives White Coat, Begins Medical School at New York Institute of Technology Horace Receives White Coat, Begins Medical School at New York Institute of Technology
Horace Receives White Coat, Begins Medical School at New York Institute of Technology
Warwick Police Divers Find Body During Body Recovery Training Warwick Police Divers Find Body During Body Recovery Training
Warwick Police Divers Find Body During Body Recovery Training
McAllister: Roof Repairs First Up for Buttonwoods Community Center McAllister: Roof Repairs First Up for Buttonwoods Community Center
McAllister: Roof Repairs First Up for Buttonwoods Community Center
  • RIDOT Traffic Alerts: Apponaug Cleanup, Bridge Inspections

    [CREDIT: Rob Borkowski] Post Road between Apponaug Four Corners and West Shore Road now sports speed bumps, side-street parking and a bicycle lane.

    [CREDIT: Rob Borkowski] Post Road between Apponaug Four Corners and West Shore Road now sports speed bumps, side-street parking and a bicycle lane.

    WARWICK, RI — With little more than stretches of sidewalk, a still closed off section of Centerville Road in front of Cumberland Farms, and signs left undone, the Apponaug Circulator Project seems on track to meet RIDOT’s long-standing goal of substantial completion by the fall.

    RIDOT has noted the following weekday alerts for motorists in Warwick as finishing touches on the project continue, along with some anticipated delays and detours for bridge inspections:

    Warwick: Motorists may experience intermittent lane closures for project wide clean up and signage installation within the Apponaug Circulator Project, including Post Rd., Veterans Memorial Dr., Veterans Memorial Dr. Extension and Centerville Rd., Monday-Friday from 6 a.m. to 4:30 p.m.

     Warwick: Rte. 1 North and South, from Williamsburg Dr. to Thurber St., right lane closures for a bridge inspection, Friday from 9 a.m. to 3 p.m.
    Warwick: Rte. 115 (Toll Gate Rd.) East and West, from Orchard Ave. to Craig Rd., right shoulder closures for a bridge inspection, Monday from 9 a.m. to 3 p.m.
    Warwick: Rte. 117 (Centerville Rd.) East and West, between the off-and on-ramps at I-95, right lane closed for a bridge inspection, Tuesday and Wednesday from 9 a.m. to 3 p.m.
    West Warwick: Rte. 115 (Main St.) South, from Clyde St. to Maple Ave., right shoulder closed for a bridge inspection, Tuesday from 8 a.m. to 3 p.m.
    x
    1
    Post Remaining